Temporary organizing is introduced as process, form and perspective. Then key challenges and opportunities in the study of temporary organizing are discussed, including methodological issues, how to theorize time, and how to relate the temporary to the more permanent. This introductory article concludes with an overview of the special issue.
AguinisH.BoydB. K.PierceC. A.ShortJ. C. (2011). Walking new avenues in management research methods and theories: Bridging micro and macro domains. Journal of Management, 37, 395–403.
2.
AguinisH.CulpepperS. A. (2015). An expanded decision-making procedure for examining cross-level interaction effects with multilevel modeling. Organizational Research Methods, 18, 155–176.
3.
AguinisH.EdwardsJ. R. (2014). Methodological wishes for the next decade and how to make wishes come true. Journal of Management Studies, 51, 143–174.
4.
AhujaG.SodaG.ZaheerA. (2012). Introduction to the special issue: The genesis and dynamics of organizational networks. Organization Science, 23, 434–448.
5.
BakkerR. M. (2010). Taking stock of temporary organizational forms: A systematic review and research agenda. International Journal of Management Reviews, 12, 466–486.
6.
BakkerR. M. (2016). Stepping in and stepping out: Strategic alliance partner reconfiguration and the unplanned termination of complex projects. Strategic Management Journal, Forthcoming. DOI: 10.1002/smj.2429
7.
BakkerR. M.BorosS.KenisP.OerlemansL. A. G. (2013). It’s only temporary: Time frame and the dynamics of creative project teams. British Journal of Management, 24, 383–397.
8.
BakkerR. M.KnobenJ. (2015). Built to last or meant to end: Intertemporal choice in strategic alliance portfolios. Organization Science, 26, 256–276.
9.
BallardD. I.SeiboldD. R. (2003). Communicating and organizing in time: A meso-level model of organizational temporality. Management Communication Quarterly, 16, 380–415.
10.
BechkyB. A. (2006). Gaffers, gofers, and grips: Role-based coordination in temporary organizations. Organization Science, 17, 3–21.
11.
BechkyB. A.OkhuysenG. A. (2011). Expecting the unexpected? How SWAT officers and film crews handle surprises. Academy of Management Journal, 54, 239–261.
12.
BeckT. E.PlowmanD. A. (2014). Temporary, emergent interorganizational collaboration in unexpected circumstances: A study of the Columbia space shuttle response effort. Organization Science, 25, 1234–1252.
13.
BradyT.DaviesA. (2004). Building project capabilities: From exploratory to exploitative learning. Organization Studies, 25, 1601–1621.
14.
BurkeC. M.MorleyM. J. (2016). On temporary organizations: A review, synthesis and research agenda. Human Relations, 69, 1235–1258.
15.
ChristophersonS.StorperM. (1989). The effects of flexible specialization on industrial politics and the labor market: The motion picture industry. ILR Review, 42, 331–347.
16.
CrookT. R.BrattonV. K.StreetV. L.KetchenD. J.Jr. (2006). Has strategic management shed the normal science straightjacket? Revisiting Bettis’ (1991) critiques. Journal of Managerial Issues, 18, 409–423.
17.
DaviesA.BradyT. (2000). Organizational capabilities and learning in complex product systems: Towards repeatable solutions. Research Policy, 29, 931–953.
18.
DeFillippiR. J.ArthurM. B. (1998). Paradox in project-based enterprise: The case of film making. California Management Review, 40, 125–139.
19.
EbersM.MaurerI. (2016). To continue or not to continue? Drivers of recurrent partnering in temporary organizations. Organization Studies, 37, 1861–1895.
20.
EisenhardtK. M.GraebnerM. E. (2007). Theory building from cases: Opportunities and challenges. Academy of Management Journal, 50, 25–32.
21.
FarjounM. (2010). Beyond dualism: Stability and change as a duality. Academy of Management Review, 35, 202–225.
22.
FloricelS.BonneauC.AudryM.SergiV. (2014). Extending project management research: Insights from social theories. International Journal of Project Management, 32, 1091–1107.
23.
GeorgeJ. M.JonesG. R. (2000). The role of time in theory and theory building. Journal of Management, 26, 657–684.
24.
GiddensA. (1984). The constitution of society. Cambridge: Polity.
25.
GoodmanR. A.GoodmanL. P. (1976). Some management issues in temporary systems: A study of professional development and manpower–the theater case. Administrative Science Quarterly, 21, 494–501.
26.
GrabherG. (2004). Temporary architectures of learning: Knowledge governance in project ecologies. Organization Studies, 25, 1491–1514.
27.
GreeneJ.CaracelliV.GrahamW. (1989). Toward a conceptual framework for mixed-method evaluation designs. Educational Evaluation and Policy Analysis, 11, 255–274.
28.
Grzymala-BusseA. (2011). Time will tell? Temporality and the analysis of causal mechanisms and processes. Comparative Political Studies, 44, 1267–1297.
29.
HelinJ.HernesT.HjorthD.HoltR. (Eds.) (2014). The Oxford handbook of process philosophy and organization studies. Oxford: Oxford University Press.
30.
HellgrenB.StjernbergT. (1995). Design and implementation in major investments—a project network approach. Scandinavian Journal of Management, 11, 377–394.
31.
HobbsB.AubryM.ThullierD. (2008). The project management office as an organisational innovation. International Journal of Project Management, 26, 547–555.
32.
JonesC.LichtensteinB. B. (2008). Temporary inter-organizational projects: How temporal and social embeddedness enhance coordination and manage uncertainty. In CropperS.EbersM.HuxhamC.RingP. S. (Eds.), The Oxford handbook of inter-organizational relations (pp. 231–255). Oxford: Oxford University Press.
33.
KallebergA. L. (2000). Nonstandard employment relations: Part-time, temporary and contract work. Annual Review of Sociology, 26, 341–365.
34.
KenisP.Janowicz-PanjaitanM.CambréB. (Eds.) (2009). Temporary organizations—Prevalence, logic and effectiveness. Cheltenham, UK: Edward Elgar.
35.
KleinK. J.KoslowskiS. W. J. (2000). Multilevel theory, research, and methods in organizations: Foundations, extensions, and new directions. San Francisco, CA: Jossey-Bass.
36.
LampelJ.LantT.ShamsieJ. (2000). Balancing act: Learning from organizing practices in cultural industries. Organization Science, 11, 263–269.
37.
LampelJ.MeyerA. D. (2008). Guest editors’ introduction: Field-configuring events as structuring mechanisms: How conferences, ceremonies, and trade shows constitute new technologies, industries, and markets. Journal of Management Studies, 45, 1025–1035.
38.
LangleyA. (1999). Strategies for theorizing from process data. Academy of Management Review, 24, 691–710.
39.
LangleyA. (2009). Studying processes in and around organizations. In BuchananD. A.BrymanA. (Eds.), Sage handbook of organizational research methods (pp. 409–429). London: SAGE Publications.
40.
LangleyA.SmallmanC.TsoukasH.Van de VenA. H. (2013). Process studies of change in organization and management: Unveiling temporality, activity, and flow. Academy of Management Journal, 56, 1–13.
41.
LanzerraG. F. (1983). Ephemeral organizations in extreme environments: Emergences, strategy, extinctions. Journal of Management Studies, 20, 71–95.
42.
LigthartR.OerlemansL.NoorderhavenN. (2016). In the shadows of time: A case study of flexibility behaviors in an interorganizational project. Organization Studies, 37, 1721–1743.
43.
LundinR.ArvidssonN.BradyT.EkstedE.MidlerC.SydowJ. (2015). Managing and working in project society—Institutional challenges of temporary organizations. Cambridge: Cambridge University Press.
44.
LundinR. A.SöderholmA. (1995). A theory of the temporary organization. Scandinavian Journal of Management, 11, 437–455.
45.
MajchrzakA.JarvenpaaS. LBagherzadehM. (2015). A review of interorganizational collaboration dynamics. Journal of Management, 41, 1338–1360.
46.
ManningS.SydowJ. (2011). Projects, paths, practices: Sustaining and leveraging project-based relationships. Industrial and Corporate Change, 20, 1369–1402.
47.
MarchJ. G. (1995). The future, disposable organizations and the rigidities of imagination. Organization, 2, 427–440.
48.
MaskellP.BatheltH.MalmbergA. (2006). Building global knowledge pipelines: The role of temporary clusters. European Planning Studies, 14, 997–1013.
49.
MathieuJ. E.ChenG. (2011). The etiology of the multilevel paradigm in management research. Journal of Management, 37, 610–641.
50.
MillerK. D. (2015). Agent-based modeling and organization studies: A critical realist perspective. Organization Studies, 36, 175–196.
51.
MintzbergH. (1979). The structuring of organizations. Englewood-Cliffs, NJ: Prentice-Hall.
52.
MoliternoT. P.MahonyD. M. (2011). Network theory of organization: A multilevel approach. Journal of Management, 37, 443–467.
53.
MorganD. (1998). Practical strategies for combining qualitative and quantitative methods: Applications to health research. Qualitative Health Research, 8, 362–376.
54.
OrlikowskiW. J.YatesJ. (2002). It’s about time: Temporal structuring in organizations. Organization Science, 13, 684–700.
55.
PowellW. W.KoputK. W.Smith-DoerrL. (1996). Interorganizational collaboration and the locus of innovation: Networks of learning in biotechnology. Administrative Science Quarterly, 41, 116–145.
56.
PradoP.SapsedJ. (2016). The anthropophagic organization: How innovations transcend the temporary in a project-based organization. Organization Studies, 37, 1793–1818.
57.
PreacherK. J.ZyphurM.ZhangZ. (2010). A general multilevel SEM framework for assessing multilevel mediation. Psychological Methods, 15, 209–233.
58.
Rabe-HeskethS.SkrondalA. (2008). Multilevel and longitudinal modeling using Stata. College Station, TX: Stata Press.
59.
RescherN. (1996). Process metaphysics: An introduction to process philosophy. Albany, NY: State University of New York Press.
60.
Sahlin-AnderssonK.SöderholmA. (Eds.) (2002). Beyond project management: New perspectives on the temporary–permanent dilemma. Malmö: Liber.
61.
SchwabA.MinerA. S. (2008). Learning in hybrid-project systems: The effect of project performance on repeated collaboration. Academy of Management Journal, 51, 1117–1149.
62.
SöderlundJ. (2011). Pluralism in project management: Navigating the crossroads of specialization and fragmentation. International Journal of Management Reviews, 13, 153–176.
63.
StarkeyK.BarnattC.TempestS. (2000). Beyond networks and hierarchies: Latent organizations in the U.K. television industry. Organization Science, 11, 299–305.
64.
StjerneI. S.SvejenovaS. V. (2016). Connecting temporary and permanent organizing: Tensions and boundary work in sequential film projects. Organization Studies, 37, 1771–1792.
65.
StorperM. (1989). The transition to flexible specialization in the U.S. film industry: External economies, the division of labour, and the crossing of industrial divides. Cambridge Journal of Economics, 13, 273–305.
66.
SwärdA. (2016). Trust, reciprocity, and actions: The development of trust in temporary inter-organizational relations. Organization Studies, 37, 1841–1860.
67.
SydowJ.LindkvistL.DeFillippiR. J. (2004). Project-based organizations, embeddedness and repositories of knowledge: Editorial. Organization Studies, 25, 1475–1489.
68.
TsoukasH. (2005). Complex knowledge: Studies in organizational epistemology. Oxford: Oxford University Press.
Van de VenA. H.PooleM. S. (2005). Alternative approaches for studying organizational change. Organization Studies, 26, 1377–1404.
72.
Van MarrewijkA. H.YbemaS.SmitsK.CleggS.PitsisT. S. (2016). Clash of the Titans: Temporal organizing and collaborative dynamics in the Panama Canal Megaproject. Organization Studies, 37, 1745–1769.
73.
YinR. K. (1994). Case study research: Design and methods (2nd edn.). Thousand Oaks, CA: SAGE Publications.