Abstract
This study addresses multi-stage hybrid flow shop scheduling in which a job is reworked if the queue time between two arbitrary stages exceeds an upper limit. The problem is to determine the allocations of jobs to machines at each stage and the start times of jobs and rework setups/operations when incurred. A mixed integer programming model is proposed for each of the makespan and the total tardiness measures. Then, because the problem is NP-hard, a scheduling mechanism is proposed that consists of three phases: (a) filtering the jobs to be delayed; (b) searching the jobs to be reworked; and (c) dispatching non-delayed and delayed jobs sequentially. Simulation results show that the mechanism proposed in this study outperforms the conventional dispatching approach in the high rework setup time case for the makespan problem and low/high setup time cases for the tardiness problem. The best priority rules of the mechanism under each of the measures are also reported.
Get full access to this article
View all access options for this article.
References
Supplementary Material
Please find the following supplemental material available below.
For Open Access articles published under a Creative Commons License, all supplemental material carries the same license as the article it is associated with.
For non-Open Access articles published, all supplemental material carries a non-exclusive license, and permission requests for re-use of supplemental material or any part of supplemental material shall be sent directly to the copyright owner as specified in the copyright notice associated with the article.