Abstract
When ore is being selected from a regularised block model, a common procedure is to accept as ore any block whose iron content exceeds a cut-off value, and whose content in each contaminant analyte is below an appropriate cut-off value. This method defines a quadrant within the multidimensional analyte space, such that any block lying within the quadrant is accepted as ore and any block lying outside the quadrant is rejected as waste. The cut-off levels can be adjusted to maximise ore tonnage at a target grade (or analyte vector). When the method is applied to a project comprising multiple pits with systematically differing grades, it is found that ore tonnage at target grade is maximised if different cut-off quadrants are used for the different pits. This is apparently illogical, because it implies that an ore block from one pit may be accepted as ore, but an identical block from another pit rejected as waste, even when ore from both pits is to be blended into the same product and there are no production cost differences between the pits. The paradox is an example of the
Get full access to this article
View all access options for this article.
