Abstract
The optimal management of a non-renewable resource extraction project is studied when input and output prices follow correlated stochastic processes. The decision problem is specified by two Bellman equations describing the project when it is currently operating or mothballed. Solutions are determined numerically using the Least Squares Monte Carlo methodology. The analysis is applied to an oil sands project which uses natural gas during extracting and upgrading. The paper takes into account the co-movement between crude oil and natural gas prices and proposes two price models: one incorporates a long-run link between the two while the other has no such link. Incorporating a long-run relationship between oil and natural gas prices has a significant effect on the value of the project and its optimal operation and reduces the sensitivity of the project to the natural gas price process.
Keywords
Get full access to this article
View all access options for this article.
References
Supplementary Material
Please find the following supplemental material available below.
For Open Access articles published under a Creative Commons License, all supplemental material carries the same license as the article it is associated with.
For non-Open Access articles published, all supplemental material carries a non-exclusive license, and permission requests for re-use of supplemental material or any part of supplemental material shall be sent directly to the copyright owner as specified in the copyright notice associated with the article.
